Category Archives: Case Study

PAL Properties Case Study

Previous slide
Next slide

PAL Properties, Aurum Green – Chineham, Basingstoke

Design & Build Domestic Project consisting of 1-2 bed  apartments & 2-5 bed houses. 130 properties built over 18 months using 3 Plumbing Engineers, and 3 Electrical Engineers. 

Located on the edge of Basingstoke, Aurum Green bridges the gap from town centre to open countryside.

With high quality living in mind, each property is crafted to ensure flexible, stylish, light and airy homes to match your way of life. All are effortlessly blending with their surroundings and stand the test of time.

Elegant interiors have been carefully designed to be both practical and stylish, with free flowing areas crafted using innovative methods and the latest suite of materials.

Fuel Type – Gas.

Heating/ Hot Water Systems – Combi Boilers & Un-vented Cylinders & Radiators.

Sanitary-ware – Wall Hung, Vanity Units.

Lighting – Down light’s & bespoke lighting options. 

Ventilation – Mixture of MVHR & Inline Fan systems.

Project timeline:

– Receive tender package & Provide quotation.

– Receive Order, Provide Preliminary Design & Request for information / Technical Submission documents

– Approve & finalize design/ Documents

– Produce procurement schedules & allocate workforce

– Establish Sales extras & execute paperwork

– Commence First Fix, Second Fix & Finals – Certifying each element as they progress

– Provide OM Handover Packs / Certification Packs

– Provide ongoing aftercare 

 

PAL Properties Case Study

PAL Properties, Aurum Green – Chineham, Basingstoke Design & Build Domestic Project consisting of 1-2 bed  apartments & 2-5 bed houses. 130 properties built over

Read More